Construction works for the new rolling mill
Execution of civil works for the new profile rolling line, including demolition, excavation and concrete works.
ContinueExecution of civil works for the new profile rolling line, including demolition, excavation and concrete works.
ContinueDesign and construction of civil works for the installation of a new wire rod train for Acciaierie Venete at the Sarezzo (BS) plant.
ContinueExecution of civil works for the upgrading of the Mantova treatment plant, including excavation and material handling, reinforced concrete works, prefabricated structures, roadways, and pavements.
ContinueProject to build the New Rolling Mill in Riesa, Germany, represents a major initiative by the Feralpi Group to enhance its production capacity in the steel processing sector.
ContinueExecution of civil works for a wind farm in Villacidro: excavation and material handling, reinforced concrete foundations, temporary and permanent internal roadways, and electrical lines.
ContinueExecution of civil works for the doubling of the sluice gates of the San Valentino dam. Excavation and controlled demolitions, reinforced concrete works, metal structures, and finishing works.
ContinueExecution of civil works for new facilities including demolition of existing structures, excavation in cramped and hard-to-reach areas, construction of C.A. works metal carpentry works and finishing to completion.
ContinueExecution of civil works for the new rolling mill at the San Zeno Naviglio (BS) plant, including new sheds, a new reheating furnace and a new rolling line.
ContinueProject to build a new scrap park in Riesa, Germany, aimed at enhancing infrastructure and promoting environmental sustainability in the steel processing sector.
ContinueExecution of civil works for the new plants, including the demolition of old structures and foundations, excavation, construction of pile foundations to support the new structures, reinforced concrete works, waterproofing and treatments, and finishing touches to complete the project.
ContinueExecution of civil works for the new hydroelectric power plant, including demolitions, excavations, excavation containment works, reinforced concrete works, and plant installations.
ContinueThe covering project of the AGL-NORD Park for Arcelor Mittal, carried out by Semat S.p.A. in Taranto in 2021, enhances the protection of materials and operational efficiency.
ContinueParchi OMO roofing project aimed at optimizing the operational efficiency and environmental sustainability of rolling mill facilities in Taranto.
ContinueExecution of civil works for the new plants, including excavation, construction of pile foundations to support the new structures, reinforced concrete works, waterproofing and treatments, and finishing touches to complete the project.
ContinueExecution of civil works for the new hydroelectric power plant, including demolitions, excavations, excavation containment works, and reinforced concrete works.
ContinueThe covering project of the AGL-SUD Park for Arcelor Mittal, carried out by Semat S.p.A. in Taranto in 2020, enhances the protection of materials and operational efficiency.
ContinueProject for the implementation of the network system for the collection and treatment of rainwater for Arcelor Mittal in Taranto.
ContinueExecution of civil works for the completion of the process building.
ContinueThe project for the coverage of the Primary Parks for Cimolai S.p.A. in Taranto, completed in 2019, enhances the protection of materials and operational efficiency.
ContinueConstruction of coke cooling showers No. 5-6 for Thyssen Krupp in Taranto. Project completed, improving cooling efficiency in the rolling mill.
ContinueIndustrial Construction for the rehabilitation and structural adjustment water tower plant TNA / 2 of the ILVA plant in Taranto.
ContinueIndustrial construction for cleaning interventions involving the areas below belt conveyors of the primary ore stockyards of ILVA Taranto.
ContinuePublic infrastructure works for the provision of broadband services in rural areas in the Emilia Romagna region affected by the digital divide.
ContinueRenovation of the civil infrastructure, overhaul of the hydraulic components, and replacement of the turbines of the Campolessi hydroelectric power plant.
ContinueIn 2016 work began on the preparation of the foundations for the new carbon coke quenching showers 5 and 6 at the ILVA plant in Taranto.
ContinueConstruction works for the rerouting of a public water course for hydroelectric use from the Serio river in the municipality of Casale Cremasco Vidolasco near Palata Malcontenta.
ContinueThe entire building and plant engineering part of the new Ansaldo Energia facility in Genoa in which the maxi Gt36 turbines will be assembled was completed.
ContinueRevamping of the Alessandro Volta hydroelectric power plant in Castel Madama (Rome) San Cosimato dam - Contract for the replacement of the bottom and flood sluice-gates.
ContinueWorks for the construction of the inland coastal road from Taranto to Avetrana 1st section - 2nd part.