The project for the construction of the 1st phase of the New Scrap Park in Riesa, Germany, represented an important initiative for the Feralpi Group, aimed at enhancing infrastructure and promoting environmental sustainability in the steel processing sector. The activities carried out on the site included several key phases, each contributing to the overall success of the project.

  1. Excavation: The initial phase involved extensive excavation to prepare the site. This operation required the use of heavy machinery and controlled excavation techniques, ensuring the safe and precise removal of soil. The excavations were carried out with consideration of the geological characteristics of the land to ensure a solid foundation for future structures.

  2. Special Foundations: Subsequently, special foundations were constructed, designed to support the structures being built. These foundations were tailored to the specific needs of the project and the soil conditions, ensuring stability and durability over time. The use of advanced technologies allowed for the optimization of the construction process and reduced completion times.

  3. Reinforced Concrete Works: The reinforced concrete works constituted a fundamental part of the park's structure. They were constructed using high-quality materials and innovative building techniques to ensure maximum strength and durability. These works provided a solid base for the upper structures and contributed to the overall safety of the project.

  4. Steel Structures: The integration of steel structures was a key element in the design of the New Scrap Park. Steel, known for its strength and lightness, was used to create modern and functional architectural elements. These structures not only enhanced the park's aesthetics but also optimized space usage, allowing for greater flexibility in the planned activities.

  5. Facade and Roof Cladding: To complete the aesthetic and functional appearance of the park, cladding for the facade and roof was installed. These elements not only provided a modern and appealing look but also improved the energy efficiency of the buildings, contributing to sustainable resource management.

  6. Finishing Works: Finally, finishing works were carried out, which included the installation of doors, grilles, and other architectural details. These final elements were designed to ensure the functionality and safety of the spaces, thus completing the project and making the park ready for public use.

The New Scrap Park represents a significant step towards enhancing industrial infrastructure and promoting sustainable practices in the steel processing sector. Thanks to the collaboration between Semat and the Feralpi Group, the project benefited from advanced technical expertise and an innovative approach, helping to create a space that not only meets industrial needs but also offers opportunities for the local community.