Old Morlana Hydroelectric Power Plant
Execution of civil works for the new hydroelectric power plant, including demolitions, excavations, excavation containment works, and reinforced concrete works.
Commissioned: INIZIATIVE BERGAMASCHE Srl |
Opera: Morlana Hydroelectric Power Plant |
Sector: Infrastructure |
Category: Energy |
Year: 2019-2020 |
The works were carried out for an important group that is already a client of SEMAT and owner of several plants dedicated to the production of clean energy from renewable sources. The plant was built in the municipality of Nembro (BG) on the Serio River and is named "OLD MORLANA POWER PLANT" as it is located on an existing weir from which it takes its name.
Although the works are of modest size, they were characterized by the particular conformation and nature of the soils, as well as the context in which they are situated, requiring special attention and high professionalism to manage all variables, in line with the respect for safety, timelines, and quality.
Geolocation Work