Revamping of the Fara Gera d'Adda hydroelectric power plant


Revamping of the hydroelectric systems and the Fara Gera d'Adda hydroelectric power plant.

Commissioned: Adda Energy SPA
Opera: Revamping of a Hydroelectric Power Plant
Category: Energy
Year: 2011
Place: Fara Gera D’Adda (BG)
Photo:

The plant was built inside a dismissed industrial facility to take advantage of the water flow coming through a canal from the Adda river built in 1870, which used to provide the power necessary for the prior plant on the site. In 2011 Semat directed the revamping works of the Fara Gera d'Adda hydroelectric power plant, the structures of which dated back to 1876. The plant, made up of a vertical-shaft Kaplan turbine combined with a revolutions multiplier gearbox and the generator, currently has a nominal power of 857.21 kW.

The first phase of the intervention provided for the lowering of the bottom of the old chambers, a complex operation since it had to be carried out at -3.50 meters below the water level. The limited space did not allow the use of a well-point system and therefore, a set of nine pumps with a total capacity of 50,000 l/min were used to control the water during the operations. With this method, the company was able to install and handover the new foundations in full compliance with the schedule established by the client, Adda Energy Spa.


Geolocation Work


SEMAT S.P.A. Civil Construction & Industrial Services

Via Fornaci 45/47, 25040 Artogne (BS)
Tel.: +39 0364 598881
Fax: +39 0364 598882